SKU: 44161551010

54” I.D. x 20’ S/S 1440psi 4 Phase Skidded Test Separator Package

Sale price$197252505.00 Regular price$219169450.00
Save 10%

Pay in installments of $54792362.50 with ShopPay, AfterPay and Klarna

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Oct 24 - Oct 29

Promo Codes Available:

For Your Every Summer RSVP, with Code: SUMMER15

Description

54” I.D. x 20’ S/S 1440psi 4 Phase Skidded Test Separator PackageFor detailed specifications, please click on the "plus" icon to open each section below General Description: 54 I. D. x 20 S S 1440psi 4 Phase Skidded Test Separator Package Condition: Used Lightly Location: Alberta, Canada Price $300,000 USD each. (3 Identical Units Available) Warranty: No Warranty (Sale is As Is, Where Is Unless Refurbishment Quoted & Accepted) Dimensions: Width 122. 25 (3,105 mm) Length 444 (11,278 mm) Height 132. 25 (3,359 mm)

For detailed specifications, please click on the "plus" icon to open each section below


Description:
54” I.D. x 20’ S/S 1440psi 4 Phase Skidded Test Separator Package

Condition:
Used – Lightly

Location:
Alberta, Canada

Price
$300,000 USD each. (3 Identical Units Available)

Warranty:
No Warranty (Sale is As-Is, Where-Is Unless Refurbishment Quoted & Accepted)

Dimensions:
Width 122.25” (3,105 mm)
Length 444” (11,278 mm)
Height 132.25” (3,359 mm)

Weight:
68,000 lbs (30,844 kg)

Tag:
V-101

Diameter:
54” I.D. (1,372 mm)

Length:
20’ S/S (6,098 mm)

MAWP:
1440 psi (9,928 kPa)

Design Temp:
130 F (54.44 C)

MDMT:
-50 F (-45.55 C)

C/A:
0.125” (3.16 mm)

Volume:
62 BBL (9.86 m3)

Phases:
4 Phase (Two Weirs – First Two Compartments c/w Sparge System)

Orientation:
Horizontal

PWHT:
Yes

Radiography:
RT-1

Year Built:
2012

Built By:
DynaCorp Fabricators

Heating Coil:
Yes – 4” single unit with (2) 1” Fig. 206 inlet/outlet connections

Sparge Piping:
Yes – (2) 1” 600# RF Nozzles c/w Tapped Hub Blind & 1” NPT 6M Ball Valve w/ Hex Plug

NOTE:
In February 2020 the vessel was re-rated to 1360 psi @ 195 F (9,377 kPa @ 90.55 C) through ABSA to achieve a higher vessel design temperature to work on high temperature wells. The original design pressure and temperature is still valid.



NOZZLE SCHEDULE:

ID# SIZE & RATING SERVICE

N1

6” – 600#RF

Inlet

N2

6” – 600#RF

Gas Outlet

N3

3” – 600#RF

PSV

N4

3” – 600#RF

Oil LC

N5 A/B

1” – 600#RF

Oil LG

N6

3” – 600#RF

Oil Outlet

N7

3” – 600#RF

H2O LC

N8 A/B

1” – 600#RF

H2O LG

N9

3” – 600#RF

H2O Outlet

N10 A/B

1” – 600#RF

Inlet LG

N11 A/B

3” – 600#RF

Drains

N12

1” – 600#RF

LSHH

N13

1” – 600#RF

PI

N14

1” – 600#RF

TI

N15

4” – 600#RF

Heat Coil

N16 A/B

1” – 600#RF

Sparge

M1/M2

20” – 600#RF

Manways


Located on the Separator Vessel (V-101) is the following instrumentation:
  • Switch High High (LSHH-101)
  • Level Alarm High (LAH-101)
  • Level Switch Low Low (LSLL-101)
  • Pressure Indicator (PI-100)
  • Pressure Switch Low (PSL-101)
  • Pressure Switch High (PSH-101)
  • Temperature Indicator w/ Thermowell (TI/TW-105)
  • 3” 1502F skid edge connection c/w 3”1502M cap w/ ½” tap & needle valve
  • “M1” Manifold Connection Point
  • Isolation Valve 4” 600# RF Ball Valve
  • Branch connection to Inlet By-Pass Manifold c/w 3” 600# RF Ball Valve
  • Removable flanged cushioned tees for elbows allow quick replacement of blind flange end or entire flange tee in the event of a wash out.
  • ½” High point vent included on top of inlet piping c/w ½” hex plug
  • Inlet Diffuser installed in vessel inlet nozzle
  • Gas Demister installed at vessel gas outlet nozzle
  • 6” 600#RF Gas outlet piping then reduced to 4” 600#RF upstream of gas meters
  • The 4” 600#RF piping is split into two Gas Meters, one is 4” and the other is 2”.
    • Meter #1 (FE-101)
      • (1) 4” 600#RF Flanged V-Cone Gas Meter
      • (2) ½” Full Port ball valves installed on V-Cone pressure taps and SST tubing to 5 valve manifold / flow computer
      • (1) Cameron NUFLO Scanner 2000 microEFM Flow Computer
      • (1) RTD installed d/s of Meter and wired to Scanner 2000
      • (1) Extra thermowell installed downstream of RTD for manual temperature readings
      • (1) 5 valve manifold, Stainless Steel, vented to PSV discharge line
      • (2) Isolation Ball Valves 4” 600#RF installed up & downstream of meter run
    • Gas Meter #2 (FE-102)
      • (1) 2” 600#RF Flanged V-Cone Gas Meter
      • (2) ½” Full Port ball valves installed on V-Cone pressure taps and SST tubing to 5 valve manifold / flow computer
      • (1) Cameron NUFLO Scanner 2000 microEFM Flow Computer
      • (1) RTD installed d/s of Meter and wired to Scanner 2000
      • (1) Extra thermowell installed downstream of RTD for manual temperature readings
      • (1) 5 valve manifold, Stainless Steel, vented to PSV discharge line
      • (2) Isolation Ball Valves 2” 600#RF installed up & downstream of meter run
  • The 4” and 2” 600#RF lines from the gas meters are combined into a single 4” 600#RF line then routed to the Back Pressure Control Valve (BPCV-101).
  • Upstream of the BPCV-101, the piping is branched off into a 3” control valve by-pass.
    • BPCV Isolation
      • (1) Isolation Ball Valve 4” 600#RF installed upstream
      • (1) Isolation Globe Valve 4” 600#RF installed downstream
    • BPCV By-Pass
      • (1) Globe Valve 3” 600#RF
    • Backpressure Control Valve (BPCV-101)
      • (1) 3” 600#RF CVS Control E Series Control Valve
      • c/w CVS 657 Size 45 Direct Acting (Fail Open) Actuator
      • Trim: TBC
    • Pressure Controller (PC-101)
      • (1) Fisher C1 Low Emission Pressure Controller
      • Sensing line tubed to upstream location
      • Supply line tubed from Fuel Gas System
  • The 4” line from BPCV-101 and the 3” 600#RF By-Pass lines are then tied together with a 3” 600#RF line and then run in parallel to skid edge. The 4” line is the “Sales Gas Outlet” and the 3” line is the “Flare Gas Outlet”. Both of these outlets are connected to each other and include isolation valves in the event inline operations need to be switched to flaring.
  • The 4” “Sales Gas” line from BPCV-101 is then reduced to 3” 600#RF and is then branched off into the 3” 600#RF Inlet By-Pass Manifold c/w Isolation Ball Valve 3”600# RF
  • After the branch for the Inlet By-Pass Manifold, the 3” 600#RF “Sales Gas” line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • The 3” 600#RF “Flare Gas” line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • Also included upstream of the isolation ball valve is “M5” Manifold Connection Point.
  • Water Level Control and Level Gauges
    • The water level is controlled using (LC-101) a Fisher L2 liquid level controller using a displacer type sensor to detect the interface of the water and oil phases inside the vessel upstream of the last weir.
    • (2) level gauges “sight glasses” are provided for the water phases in the vessel. LG-101 is located upstream of the first weir and LG-102 is located upstream of the last weir.
      • Both Level Gauges include ½” Drain Ball Valves and are tubed to common drain header and liquid volume gauge board mounted beside Level Gauge.
      • LG-101 consists of (3) sections of TM5 Transparent Level Gauges, (1) Set of two ¾”x1/2” gauge cocks, (2) Isolation Ball Valves ¾” NPT 2M and (2) 1” 600# RF Nozzles c/w Tapped Hub Blind ¾” FNPT
      • LG-102 consists of (2) sections of TM5 Transparent Level Gauges, (1) Set of two ¾”x1/2” gauge cocks, (2) Isolation Ball Valves ¾” NPT 2M and (2) 1” 600# RF Nozzles c/w Tapped Hub Blind ¾” FNPT
  • The water outlet includes a Vortex breaker in vessel.
  • A 3” 600#RF nozzle is used for the water outlet connection. From this nozzle 3” 600#RF piping is routed to both the drain header and water metering / skid edge. Both lines include Isolation Ball Valves. Between the two isolation valves is “K” Chemical Injection Point
  • Downstream of the Isolation valve the 3” 600#RF main water outlet line is branched off into a 2” 600#RF for the flow meter than recombined back into the 3” line. The branch run includes:
    • (2) Isolation Ball Valve 2” 600#RF
    • (2) High Point vents c/w ½” NPT hex plugs
    • (1) Wye- Strainer 2” 600# RF Flanged c/w ½” NPT 2M drain ball valves tubed back into water line downstream of the level control valve.
    • (1) Cameron Nuflo EZ-IN 2” 600#RF wafer style liquid turbine flow meter, c/w magnetic pick up, 3” extension and centralizers
    • (1) Cameron Nuflo MCIII EXP Totalizer
  • After the upstream liquid meter branch connection, the 3” line c/w 3” 600#RF Isolation Ball valves which is Normally Closed. This valve is used when by-passing the liquid meter is required.
  • Once the 2” liquid meter line is recombined into the 3” line, the 3” line is then reduced down to 2” and it is routed to LCV-202 the Water Level Control Valve.
    • Water Level Control Valve (LCV-202)
      • (1) 2” 600#RF Fisher D4 Dump Valve
      • c/w Reserve Acting (Fail Closed) Actuator
      • Trim: TBC
  • After the Water Level Control Valve (LCV-202) the 2” line is increased to 3” 600#RF and is then branched off into the 3” 600#RF Inlet By-Pass Manifold c/w Isolation Ball Valve 3”600# RF
  • The 3” 600#RF “Water Outlet” line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • Also included upstream of the isolation ball valve is “M3” Manifold Connection Point.
  • Oil Level Control and Level Gauge
    • The oil level is controlled using (LC-102) a Fisher L2 liquid level controller using a displacer type sensor to detect the level height of oil phase inside the vessel downstream of the last weir.
    • (1) level gauge “sight glass” are provided for the oil phase in the vessel. LG-103 is located downstream of the last weir.
      • Level Gauge include ½” Drain Ball Valves and is tubed to common drain header and liquid volume gauge board mounted beside Level Gauge.
      • LG-103 consists of (2) sections of TM5 Transparent Level Gauges, (1) Set of two ¾”x1/2” gauge cocks, (2) Isolation Ball Valves ¾” NPT 2M and (2) 1” 600# RF Nozzles c/w Tapped Hub Blind ¾” FNPT
  • The oil outlet includes a Vortex breaker in vessel.
  • A 3” 600#RF nozzle is used for the water outlet connection. From this nozzle 3” 600#RF piping is routed to both the drain header and oil metering / skid edge. Both lines include Isolation Ball Valves. Between the two isolation valves is “Z” Chemical Injection Point
  • Downstream of the Isolation valve the 3” 600#RF main oil outlet line is branched off into a 2” 600#RF for the flow meter than recombined back into the 3” line. The branch run includes:
    • (2) Isolation Ball Valve 2” 600#RF
    • (2) High Point vents c/w ½” NPT hex plugs
    • (1) Wye- Strainer 2” 600# RF Flanged c/w ½” NPT 2M drain ball valves tubed back into the oil line downstream of the level control valve.
    • (1) Cameron Nuflo EZ-IN 2” 600#RF wafer style liquid turbine flow meter, c/w magnetic pick up, 3” extension and centralizers
    • (1) Cameron Nuflo MCIII EXP Totalizer
  • After the upstream liquid meter branch connection, the 3” line c/w 3” 600#RF Isolation Ball valves which is Normally Closed. This valve is used when by-passing the liquid meter is required.
  • Once the 2” liquid meter line is recombined into the 3” line, the 3” line is then reduced down to 2” and it is routed to LCV-201 the Oil Level Control Valve.
    • Oil Level Control Valve (LCV-201)
      • (1) 2” 600#RF Fisher D4 Dump Valve
      • c/w Reserve Acting (Fail Closed) Actuator
      • Trim: TBC
  • After the Oil Level Control Valve (LCV-201) the 2” line is increased to 3” 600#RF and is then branched off into the 3” 600#RF Inlet By-Pass Manifold c/w Isolation Ball Valve 3”600# RF
  • The 3” 600#RF “Oil Outlet” line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • Also included upstream of the isolation ball valve is “M4” Manifold Connection Point.
  • On the upstream side of the first weir (dirty side) there are (2) two 3” 600#RF drain connections on the bottom of the vessel. Each drain connection has an Isolation Ball Valve 3” 600#RF. Between the vessel and isolation valves are Chemical Injection Points “W” and “X” (one each).
  • Downstream of the Isolation Ball Valves the lines are combined into the common drain header and is then branched off into the 3” 600#RF Inlet By-Pass Manifold c/w Isolation Ball Valve 3”600# RF
  • The 3” 600#RF Drain line is routed to skid edge. Included at skid edge is a 3” 600# RF Isolation Ball Valve then a cross over flange from 3” 600#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • Also included upstream of the isolation ball valve is “M2” Manifold Connection Point.
  • The vessel is fitted with a sparge system designed to accept high pressure water which is routed to a coil on the inside lower portion of the vessel. The high pressure water is sprayed from the sparge coil into the vessel to break up accumulated solids which are removed through the drain nozzles.
  • The vessel and process piping are protected from over pressurization by (1) Pressure Safety Valve (PSV-101). The PSV nozzle on the vessel is 3” 600#RF and piping reduced to 2” upstream of PSV-101.
    • PSV-101 Pressure Safety Valve
      • Axelson Model: 9A-46030-311A35Y
      • 2” 600# RF x 3” 150# RF
      • Pilot Operated
      • G Orifice
      • Set @ 1440 psi (9928 kPa)
      • Capacity: 41,109 SCFM
  • The 3” 150#RF PSV Discharge line is routed to skid edge. Included at skid edge is a cross over flange from 3” 1500#RF to Fig. 206 M c/w Fig. 206 F Blanking cap for transportation.
  • The Instrument Air Scrubber inlet piping starts at Skid edge with 1” NPT Union to be connected to off skid air supply by others. The pressure reducing valve PRV-201 is located on the 1” inlet line and reduces the pressure to take set by the operator.
  • The scrubber and related process piping are protected from over pressurization by (1) Pressure Safety Valve (PSV-103). The PSV is located on the inlet piping of the Instrument Air Scrubber downstream of PRV-103.
    • PSV-103 Pressure Safety Valve
      • Taylor Valve Model: 82E4351311
      • 1” MNPT x 1” FNPT
      • Convention Type PSV
      • E Orifice
      • Set @ 150 psi (1034 kPa)
      • Capacity: 582 SCFM
  • The 1” PSV Discharge line is routed to skid edge and discharges to atmosphere near the roof line.
  • Installed in the outlet of the Instrument Air Scrubber is a high level shut off float. The purpose of this float is that as the vessel fills with liquid, the liquid will raise the float and once it reaches the top of its travel limit the float will block the flow of air out of the scrubber. The benefit to this shut off is that it prevents unwanted liquid from entering the instrumentation air supply lines and eventually entering the instruments and devices.
  • After the high level shut off, there is an instrument air manifold installed on top of the scrubber. Here there are (6) branches, each with its own pressure reducing regulator (PRV-101 to 106). Each of these PRVs is responsible for air supply to a specific instrument.
  • On the top of the instrument air manifold in a pressure indicator (PI-201) c/w ½” NPT needle valve.

Instrument Air Scrubber:

Tag:
V-103

Diameter:
6.065” I.D. (154 mm)

Length:
36” S/S (914 mm)

MAWP:
150 psi (1,034 kPa)

Design Temp:
649 F (343 C)

MDMT:
-20 F (-18.88 C)

C/A:
Nil” (Nil mm)

Volume:
x BBL (x m3)

Phases:
2 Phase

Orientation:
Vertical

PWHT:
No

Radiography:
No

S/N:
1007.11567

Year Built:
2012

Built By:
LO TECH MANUFACTURING

NOZZLE SCHEDULE:
ID# SIZE & RATING SERVICE

N1

1” – CLR 2M

Inlet

N2

1” – CLR 2M

Outlet

N3

3/4” – CLR 2M

Drain


  • This unit is equipment with a chemical injection system that consists of the following equipment
    • (2) Methanol Pumps (P-101 and P-102)
      • Haskel
      • Air Driven
      • Xx GPM (xx LPM)
      • Max Pressure: 10,000 psi (68,950 kPa)
    • (1) Chemical Storage Tank (T-800)
      • 500 gal. (1893 liters)
      • Pressure Relief Valve 7 psi / 0.5 psi Vacuum
  • The 1” NPT outlet line from the Chemical storage tank is routed through a filter than into the Chemical Pumps suction header.
  • The Pumps, HP chemical injection manifold and related tubing lines are protected from over pressurization by (1) Pressure Safety Valve (PSV-301). The PSV is located on the inlet of HP chemical injection manifold downstream of P-101 and P-102.
    • PSV-301 Pressure Safety Valve
      • Brand: Unknown Model: TBC
      • 1/4” MNPT x 1/4” FNPT
      • Set @ 1440 psi (9928 kPa)
  • The 3/8” PSV Discharge Tubing line is routed to the suction header for both pumps.
  • Alarms
    • LAH-101 is wired to exterior mounted Junction Box with a two position hand switch to enable or overside & silence the visual red beacon and audible siren alarm.
  • Shutdowns
    • PSL-101 / PSH-101, LSHH-101 and LSLL-101 are all pneumatic switches which are tubed back to an external mounted Junction Box with panel mounted indicators for Lo Level, Hi Level, Hi/Lo Pressure.
    • This junction box has two tubing connections, the first for air or nitrogen to charge the system and the second is to be connected to a pneumatic actuator mounted on an ESD valve located at the well head on the flow line

Style:
Oilfield Rollend

Width:
122.25” (3,105 mm)

Length:
444” (11,278 mm)

Type:
Unit is fully enclosed in single building

Style:
Foam Panel Construction

Width:
122.25” (3,105 mm)

Length:
444” (11,278 mm)

Height:
132.25” (3,359 mm)

Heaters:
Yes – (2) Electric Ruffneck Model: xxxx

  1. Building can be removed, and gas spools removed for transport to reduce height
  2. Refurbishment, retrofit, repackaging to customer specifications available upon request
Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy
SKU: 44161551010

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

4.6 ★★★★★
Based on 10 reviews
Sort
Highest Rating
Newest First
Oldest First
Product Reviews
L
Verified Purchase
lele
Natrona Heights, US
★★★★★ 5
Love this protection plan
Quick and easy. My daughter's cracked her screen on her phone, as soon as it happened I went on the app, filed the claim. Ten minutes later I received the email with the shipping lable. The following day I dropped the phone off at ups and 4 hours later I received the digital gift card. Ive filed several claims since getting the protection plan and with four kids its definitelysomething im glad to have especially since i dont have to buy a protectionplan for each item now. I have filed claims for electric scooter the stoped working for no reason, my son's phone stopped charging, my oldest daughter cracked her phone screen, my son's video game controllers up and died and each time it was quick and easy and no fuss
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 13, 2026
M
Verified Purchase
Miguel Denyer
Battle Creek, US
★★★★★ 1
Don't waste your money - these people will not help you
On March 9th 2024, I purchased a MCombo Lift Chair costing $785. On the same day, through the same Amazon account (my PERSONAL account since I also have a business account), I purchased an Asurion Complete Protect policy at the cost of $16.99 per month plus taxes. About one month ago, a problem arose with the chair that required me to make a claim using the "Complete Protect" policy that I had purchased for that very item. The claim was initiated on January 1st, 2025 - On January 3rd, I received an email asking me for photographs showing the damage for which I was making a claim. I sent those photographs via email to the address provided on January 6th. On January 27th, having not received ANY response from Asurion, I contacted them via phone and was told that my purchase had been made with a business account, that it was being used for business purposes, and was therefore not covered. I assured the Asurion Representative that it was most certainly not a business use, and that the chair that I was claiming for had been purchased because I had extensive shoulder surgery done that made it impossible to get in and out of bed. After speaking (unsuccessfully) with the Asurion Rep, I then contacted Amazon Customer Service. I spoke with an Amazon Customer Service Representative on the phone who confirmed that I had in fact used my personal account to purchase the chair and the Asurion Complete Protect policy. That representative went on to send a message to Asurion on my behalf confirming that the purchase was for personal use and not business use. Asurion responded, asking me to call them with the order number for the Asurion purchase. The number I gave was the exact same order number on my order history, however, the Asurion Rep could not find it. I was finally able to discover that the order number in Asurion's system was entirely different and isn't even in the same format as an Amazon order number. Upon the Asurion representative finding my plan, she informed me that the chair was listed as being purchased for business use (despite Amazon confirming that it was NOT) but that I should give them "a couple of business days" to resolve the issue. Five business days later, still no response and so I called them again (Yesterday - February 1st 2025)... Lo and behold, I got the same crap yet again... the purchase was listed as business use and was therefore being denied, but she promised to remove the business use commentary and put the claim through again. Today, February 2nd, I called Amazon yet again to escalate and had to call THREE times because the first two calls resulted in me finally being connected to an Asurion representative (two different reps) and each time, the Asurion representative hung up the phone as soon as my name was mentioned. It has become clear to me that the Asurion "Complete Protect" policy is a SCAM - they will NOT take care of your issue, regardless of how long you've been paying. I have been paying every month since March 9th last year - so they've received over $170 from me thus far, with zero other claims, and if I am able to cancel right now, I will only receive $16.99 back. All I want, is the chair that I purchased the policy for coverage of, to be repaired or replaced. Asurion are NOT helping, and are actively avoiding contact. At this point, I am considering legal action against Asurion for fraud - perhaps even a Class Action. I'll wait and see if my issue gets resolved within the next 10 days or so.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on February 2, 2025
C
Verified Purchase
CamRam
Los Angeles, US
★★★★★ 5
Asurion is AWESOME!
Ok, so let me start with the fact that you should NOT waste your time calling Amazon's customer service if you think you have a claim under Asurion's monthly protection plan. CALL ASURION! I wasted almost an hour with Amazon representatives that have absolutely no training in how the Asurion plan works, or even any idea if my item was covered. In fact, they told me the mechanized chair I purchased under the plan wasn't covered! Finally, my call got escalated to a manager who was just as clueless about my coverage, but had the best idea ever... call Asurion! The smartest thing I did that morning was hang up with Amazon, and reach out to Asurion as I should have done in the first place. Dealing with Asurion's customer service, after my Amazon call, was like being elevated to VIP status! 😄 Asurion's rep nicely took all my info, including the chair's purchase date and order number. Then they asked that I upload a couple of pictures of the product, along with a written description of the malfunction I had mentioned over the phone. This is where it gets really good. They told me they'd review the claim to determine if they'd send a repair specialist or reimburse me the cost of the item. In less than 48 hours, they determined that a payout was in order, and sent me an email that included an Amazon gift card for the total cost of the item minus the taxes I had paid, which I loaded directly into my Amazon wallet. Apparently, Asurion does not include the purchase taxes in their coverage. But, I can live with that. All in all, Asurion's claims division get a double thumbs up 👍🏽👍🏽, and the company gets big ups from me for not only standing behind their protection plan, but doing so expeditiously! Special note: If you buy a lot of stuff from Amazon, and have Asurion's monthly protection plan, scroll the item listing before pulling the trigger on your purchase... you need to see the green streamer that indicates your product is protected by the plan. If you don't see that, check to see if there are alternative products that might be covered. There are very few electronic or high ticket items that aren't covered, but looking for that green banner in the item description that says it's covered is key to foregoing any future headaches.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on April 26, 2026
S
Verified Purchase
Shance L McGuffey
Dallas, US
★★★★★ 5
If they can't fix it they will replace it.
This protection plan that i pay monthly for paid for itself ten fold. My 3D printer just quit working and after the manufacturer warrenty had ran out at that. I submitted my claim they emailed me a shipping label in which I shipped out my printer that same day. Two days later they received my printer determined it couldc not be fixed and sent me a Amazon gift card for the full price of my printer. Today I will be receiving my new 3d printer thanks to Complete Protect. I highly recommend anyone and everyone to purchase this policy. This warrenty is like having a home warrenty like Homeshield but for your electronics and probably other stuff that i just have not read to see what else. This insurance will save me so much money over the corse of this year and every year after that. Thank you Complete Protect.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on May 22, 2026
N
Verified Purchase
nicolas juarez
Fort Morgan, US
★★★★★ 5
"Outstanding support and a seamless process!"
Great experience with Asurion insurance through Amazon. I wasn't sure how to register my items for the monthly plan, but the customer support team in the chat was incredibly efficient and guided me through the entire paperwork process smoothly. Furthermore, the service I received at the repair shop (Break Fix) was excellent. The whole process was seamless, and I received my digital gift card without any issues, which I’ve already applied to my Amazon account. I am very grateful for their professionalism and how easy they made everything. Highly recommended!"
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on June 10, 2026

recommand products