SKU: 8935243900

Eaton Managed rack PDU, 0U, L6-30P input, 5.76 kW max, 200-240V, 24A, 10 ft cord, Single-phase, TAA compliant

Sale price$884.12 Regular price$982.36
Save 10%

Pay in installments of $245.59 with ShopPay, AfterPay and Klarna

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 14 - Aug 19

Promo Codes Available:

For Your Every Summer RSVP, with Code: SUMMER15

Description

Eaton Managed rack PDU, 0U, L6-30P input, 5.76 kW max, 200-240V, 24A, 10 ft cord, Single-phase, TAA compliantIntroducing the Eaton ePDU G3 Managed rack PDU, a premier power distribution solution designed for dense data centers, edge deployments, and mission critical lab environments. This 0U, single phase unit delivers precise, billing grade power monitoring at the outlet level, enabling unparalleled visibility and control over your critical IT loads. With a local LCD pixel display for immediate onsite readings and a reliable network connection for remote

Introducing the Eaton ePDU G3 Managed rack PDU, a premier power distribution solution designed for dense data centers, edge deployments, and mission-critical lab environments. This 0U, single-phase unit delivers precise, billing-grade power monitoring at the outlet level, enabling unparalleled visibility and control over your critical IT loads. With a local LCD pixel display for immediate onsite readings and a reliable network connection for remote management, the Eaton ePDU G3 helps you optimize uptime, streamline capacity planning, and implement data-driven power strategies across your infrastructure. Built to maximize efficiency, minimize downtime, and simplify power management, this PDU is the smart choice for modern facilities that demand accuracy, reliability, and scalability in a compact 0U footprint.

  • Outlet-level metering with billing-grade accuracy: The ePDU G3 Managed technology provides precise monitoring at the individual outlet level, measuring current, voltage, power, and energy. This granular data enables accurate chargeback, precise capacity planning, and effective load balancing, helping you allocate power resources where they are needed most and optimize overall IT efficiency. The combination of a local LCD pixel display and a network-connected management interface ensures you can access critical data on-site or remotely as business needs evolve.
  • Compact 0U design with robust power capacity: This PDU is engineered to fit precisely into high-density racks while delivering serious power to connected devices. With a 5.76 kW maximum load and a 200-240V input range, it supports up to 24A of current, making it suitable for a wide range of servers, storage, and networking equipment. The L6-30P input plug pairs with a dedicated, 10 ft cord to provide reliable, balanced power delivery in both small and large rack environments, all in a 0U footprint that preserves valuable rack space for IT gear.
  • Remote management and data-driven visibility: Beyond local readings, the Eaton ePDU G3 supports remote monitoring and management over a network. This capability enables centralized dashboards, proactive alerting, and seamless integration with data center infrastructure management (DCIM) workflows. By consolidating energy data from multiple outlets and PDUs, you gain a comprehensive view of your facility’s energy usage, identify opportunities for efficiency, and reduce operational risk through timely insights.
  • Rugged, compliant, and ready for enterprise deployments: The PDU is designed for professional data center and enterprise use, featuring a compliant, enterprise-grade build. It is TAA-compliant, aligning with procurement requirements for government and regulated environments. The 0U form factor, along with the sturdy construction and reliable power electronics, ensures long-term reliability in demanding rack installations while maintaining easy maintenance and serviceability.
  • Enhanced efficiency, cost control, and uptime: By providing accurate, outlet-level measurements and reliable power distribution, this PDU supports proactive capacity planning, immediate fault detection, and targeted power optimization. Real-time data reduces the guesswork around when and where to add capacity, decreases energy waste, and improves uptime by preventing overloads and cascading failures. The combination of local and remote monitoring options makes it easier to manage power budgets and sustain mission-critical workloads.

Technical Details of Eaton Managed rack PDU

  • Model/Type: Eaton ePDU G3 Managed (0U rack-mount, single-phase)
  • Input: L6-30P
  • Voltage Range: 200-240V
  • Max Load: 5.76 kW
  • Current Rating: 24 A
  • Cord Length: 10 ft
  • Phase: Single-phase
  • Mounting: 0U rack-mounted
  • Compliance: TAA compliant
  • Monitoring: Outlet-level metering with high-accuracy readings; local LCD pixel display; network connectivity for remote monitoring
  • Energy Metrics: Current, voltage, power, and energy measurements per outlet to support load balancing and capacity planning
  • Management: Managed technology enabling remote management, data collection, and integration with DCIM/workflow tools

How to install Eaton Managed rack PDU

  • Step 1 — Plan and safety: Before you begin, review your rack layout and ensure you have a dedicated 200-240V circuit or circuits capable of delivering up to 24A. Confirm rack mounting space and clearances, and verify that the installation site complies with all local electrical codes and safety guidelines. Gather required tools and ensure you have appropriate labeling for outlets and circuits to support future maintenance and capacity planning.
  • Step 2 — Mounting the PDU: Slide the PDU into the 0U space of your rack or attach any mounting brackets provided by the manufacturer. Align mounting holes with rack rails and secure the unit firmly using the appropriate screws. Ensure the PDU is level and properly supported to prevent strain on the cord and connectors during operation.
  • Step 3 — Connect power and grounding: Connect the 10 ft power cord to a dedicated 200-240V supply using the L6-30P input plug. Verify the circuit breaker is sized to support up to 24A and that grounding conductors are properly connected. Avoid shared or multi-branch circuits that could introduce voltage fluctuations or overload risk.
  • Step 4 — Network and management setup: If you plan to use remote monitoring, connect an Ethernet cable from the PDU’s management port to your network or DCIM environment. Power on the PDU and access the local LCD display to verify basic readings. Configure IP address and any required credentials through the local interface or the management software as supported by your environment.
  • Step 5 — Configure outlets and monitoring: Program outlet names, assign circuits, and enable any required alarms or alerts. Confirm that outlet-level metering is active and that readings reflect connected devices. Run a quick test by powering a known load and verifying that measured current, voltage, and energy values align with expectations on both the local display and the management interface.
  • Step 6 — Documentation and ongoing maintenance: Document outlet assignments, power budgets, and alert thresholds. Schedule regular reviews of energy usage and capacity to optimize efficiency. Periodically inspect cabling, connections, and the PDU housing for signs of wear and ensure firmware or management software is kept up to date per Eaton’s recommendations.

Frequently asked questions

  • Q: What voltage does this PDU support?

    A: The Eaton ePDU G3 Managed supports 200-240V, suitable for standard North American and international data center environments requiring single-phase power.

  • Q: How much load can it handle?

    A: It provides a maximum load of 5.76 kW and a current rating of 24 A, making it capable of distributing substantial IT equipment power within a single 0U rack footprint.

  • Q: Does it monitor power at each outlet?

    A: Yes. The PDU features outlet-level metering with billing-grade accuracy, enabling precise visibility into per-outlet power usage for chargeback, optimization, and capacity planning.

  • Q: Is the PDU compliant with procurement requirements?

    A: Yes. The unit is TAA compliant, ensuring compatibility with government and enterprise procurement standards.

  • Q: What installation environment is it best suited for?

    A: It is ideal for data centers, edge computing deployments, and labs that require dense rack space, reliable power distribution, and comprehensive energy monitoring with remote management capabilities.

  • Q: Can I monitor this PDU remotely?

    A: Yes. The PDU includes network connectivity for remote monitoring and management, enabling centralized visibility and control across multiple PDUs and outlets.

Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy
SKU: 8935243900

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

4.8 ★★★★★
Based on 12 reviews
Sort
Highest Rating
Newest First
Oldest First
Product Reviews
C
Verified Purchase
Clarence Bobo
Phoenix, US
★★★★★ 5
The book is good the artwork is great. The story and plot is also good .
Format: Paperback, Format: Paperback
This is a must read for fans to of Marvel Comics. Ultimate Wolverine is an awesome comic to read. Not spoil the plot if you have the ultimate weapon at your disposal. How would use it?
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on January 27, 2026
I
Verified Purchase
Ignacio Monje
Birmingham, US
★★★★★ 4
An interesting, if a little derivative, take on Wolvie’s origins
Format: Kindle
At this point Wolverine origin stories are a dime a dozen and they all will inevitably be held to the standard of the classic Barry Windsor-Smith Weapon X series and while this book tries to reach those heights, it doesn’t quite make it in terms of its writing, it does rival it in terms of art tho, which is nice. Again, another book I wish I could give half stars with because my rating for this book is closer to a 3.5 stars and it’s mostly carried by the art, but it’s leaning closer to the upper half of that rating so that’s why I went with 4. Regardless, my biggest issue comes from the fact that by and large it isn’t THAT different from the usual Wolvie origin story that was established in 616, the whole concept of Logan being the Winter Soldier isn’t used to its fullest potential because (spoilers) it’s tragically short lived, as he is back with this universe’s equivalent of the 616 X-Men by the end of Issue #6; I will say that what little there is of him being the Winter Soldier is cool as hell thanks to Cappuccio's artwork. Seriously, that is the best part of the book: Alessandro Cappuccio's artwork. I loved him on Moon Knight and I love him here, he is a master of delivering high impact artwork whenever it’s needed. Overall it’s a solid book that didn’t take much advantage of its interesting new premise before returning to status quo, but it’s at least carried by some killer artwork.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on January 19, 2026
J
Verified Purchase
Juan
Cuba, US
★★★★★ 5
Great story telling and art combination
Format: Paperback
It is a great alternate option to all superhero fans, the story telling and art combination is great
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on February 12, 2026
J
Verified Purchase
John Gill
Natrona Heights, US
★★★★★ 5
The best Graphic Novel yet!!!
Format: Paperback
I was impressed with the whole delivery. I had a great experience with the delivery.
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on February 24, 2026
A
Verified Purchase
Amazon Customer
Chelsea, US
★★★★★ 5
A new beginning
Format: Paperback
At first I was like meh this is weird then after I understood better it was dope
WAS THIS REVIEW HELPFUL?YesReportShare
Reviewed in the United States on January 20, 2026

recommand products